Quick answer: do you need a permit for a driveway in Burnaby?
Yes, if you are building a new driveway or widening one. The City of Burnaby approves new driveway crossings and changes to existing ones, and asks for a site plan showing the driveway’s location, width and slope. Most single-family lots get one driveway, and lane access comes first when a lane exists.
That short answer covers most homeowners, but the details matter. The width of the crossing, the slope of the driveway and the distance to poles, hydrants and trees all decide whether your plan is approved as drawn. This guide explains the City’s published rules in plain language, so you know what to expect before you book a paving contractor in Burnaby.
When a driveway permit is needed in Burnaby
The City’s driveway crossing page says you will need a permit if you want to build or widen a driveway. The crossing is the part of the driveway that runs over City property, across the boulevard and sidewalk, to reach the street or lane.
You will usually need City approval if you are:
- Building a driveway where there is none today
- Widening an existing driveway where it meets the street or lane
- Moving the driveway to a new spot on the lot
- Removing an old driveway as part of a rebuild or new home
If you are only resurfacing or replacing a driveway inside its existing footprint, with no change at the street or lane, the City’s page does not address that case directly. Call the City’s Engineering line at 604-294-7460 to confirm before work starts. A good contractor will raise this question with you at the estimate stage.
Who applies, and how the process works
For a new home or a major renovation, the builder or property owner submits a detailed building and site plan to the Building Department. If the driveway is the only work, or you are making only minor changes to an existing driveway, the City says you can apply directly to its Transportation Division.
A traffic technician and an engineering inspector review the plan. Once it is approved, the City contacts you about the fees for its portion of the work and the cost of the final inspection. The City does not publish a set fee on the page, so the cost is confirmed after approval.
As the owner, you are responsible for the cost of new driveway crossings, removing old crossings you no longer need, and moving anything that blocks the new access.
What the site plan must show
The City asks for a plan that clearly shows:
- The existing and proposed driveway and on-site parking
- Any existing driveways that will be removed
- The location, width and elevations (slope) of the new driveway
- Nearby trees, hydro poles, lamp standards and fire hydrants, with distances to each
Burnaby driveway rules at a glance
The figures below come from the City’s Proposed Driveway Drawing Requirements for single-family (R1) lots and its guide to parking areas and driveways. Always check the current versions, since the City updates them.
| Rule | What Burnaby allows | Why it matters for paving |
|---|---|---|
| Number of driveways | One driveway access per R1 lot | You cannot add a second curb cut for extra parking |
| Access priority | From the lane when a lane exists | Many lots must be paved from the back, not the street |
| Street crossing width | 19.7 ft or 40% of lot width, minimum 9.8 ft | Sets how wide the paved apron can be at the street |
| Lane crossing width | Up to 29.5 ft, plus a 10 ft parking pad | Lane-access lots can have wider parking areas |
| Slope on the street portion | Maximum 5%, never flat | The first section must drain and must not be level |
| Slope at a lane | Maximum 10% | Lane aprons need careful grading |
| Slope inside the property | Maximum 15% to the garage | Very steep lots may need regrading or walls |
| Grade changes | No more than 10%, spaced at least 19.7 ft apart | Stops cars scraping at sharp dips |
| Clearance from obstructions | At least 5 ft from poles, guy wires, hydrants and street lights | Can decide exactly where the driveway goes |
| Corner lots | At least 14.8 ft from where the property lines meet | Keeps driveways back from intersections |
The parking areas guide states the street access limit as the lesser of 6.0 metres or 40% of the lot frontage, so on a narrow lot the 40% figure is the one that applies.
Slope rules and steep Burnaby lots
Burnaby has some of the steepest residential streets in Metro Vancouver, especially around Burnaby Mountain, Capitol Hill and the slopes above the Fraser River. The slope rules are where many driveway plans need the most work.
- Street portion: the part of the driveway on City property can slope no more than 5%, and it cannot be completely flat, so water drains properly.
- Lane portion: up to 10%.
- Inside your property: up to 15% to an attached or detached garage.
- Grade breaks: changes in slope should not be more than 10% and should be at least 19.7 feet apart.
If your lot is steeper than these limits, the driveway may need to be regraded, curved or supported with a retaining wall to hold the edge. The City also does not allow ramping into its right-of-way, so the driveway has to meet the street or lane at the existing edge.
On steep driveways, the surface finish matters too. Exposed aggregate concrete gives better grip in the rain than smooth concrete, and our guide to exposed aggregate vs stamped concrete explains the difference.
Drainage and paved area limits
Burnaby’s parking guide also limits how much of your lot can be hard surface. Not more than 70% of a lot can be covered by impervious materials such as asphalt, concrete and roofs.
Drainage rules depend on size. A driveway of up to 600 square feet on a single-family lot, or 1,200 square feet on a two-family lot, can drain to the street or lane. Larger driveways and all paved parking areas must drain on your own property. That usually means a trench drain, catch basin or a permeable surface that lets water soak into the ground.
If you are close to the coverage limit, a permeable option can help. Grass-grid paving, like the overflow parking area we built at Nat Bailey Stadium, lets rain pass through while still carrying vehicles.
How the rules affect your choice of material
The City’s rules don’t tell you whether to use asphalt or concrete, but they shape the job:
- Asphalt is flexible, quick to install and usually ready to drive on within 24 to 48 hours. It suits long lane-access driveways and lots where the budget matters most. See our asphalt driveway paving page.
- Concrete costs more up front but can last 30 years or more, and holds crisp edges at the street crossing. Learn about concrete driveway installation.
- Decorative concrete, such as exposed aggregate or stamped concrete, adds grip and curb appeal on visible front driveways. See our custom concrete driveway options.
For typical prices by material and size, read our 2026 driveway cost guide for Vancouver and Burnaby. For how long each surface lasts, see asphalt driveway lifespan in Vancouver and Burnaby.
A simple timeline for a new or widened Burnaby driveway
- Site visit and estimate. Your contractor measures the lot, checks the slope, drainage and nearby poles or trees, and tells you whether City approval is needed.
- Site plan. The plan shows the existing and proposed driveway, its width, its slope and the distances to obstructions.
- Submit to the City. Send it to the Building Department with a building permit, or to the Transportation Division if the driveway is the only work.
- Review and approval. City staff review the plan and confirm the fees for the City’s portion and the final inspection.
- Removal and base work. The old surface comes out and the gravel base is built and compacted to the approved grades.
- Paving or pouring. Asphalt is laid and rolled, or concrete is formed, poured and finished.
- Final inspection. The City inspects the crossing before the job is signed off.
Planning ahead helps. May to September is the best paving weather in the Lower Mainland, so starting the approval process in late winter or early spring gives you the best chance of a summer start.
Common mistakes that slow down approval
- Asking for a second driveway on a single-family lot that already has one
- Paving from the street when the lot has a usable lane
- Leaving out obstructions such as a hydro pole or boulevard tree on the site plan
- Ignoring the slope limits on steep lots and having to redesign later
- Paving too much of the lot and going over the 70% hard-surface limit
- Forgetting drainage on driveways larger than 600 square feet
Each of these can send a plan back for changes, which can push your project into the wet season.
Why local experience matters
Bortolo and Sons Paving Co. Ltd. has worked on Burnaby driveways since 1974, from our yard at 7310 Union St. We know which streets are steep, where lanes are common, and how much the base and drainage matter on wet ground near Big Bend. That local knowledge helps you avoid surprises at the planning stage.
If you are comparing quotes, our guide on how to choose an asphalt paving contractor in Burnaby lists the questions worth asking.
Frequently asked questions
Do I need a permit to build a driveway in Burnaby?
Yes. The City of Burnaby says you need a permit to build or widen a driveway. It approves new driveway crossings and changes to existing ones, and asks for a site plan showing the driveway’s location, width, slope and nearby trees, poles and hydrants. Builders usually include it with the building permit.
How wide can a driveway be in Burnaby?
Burnaby’s drawing requirements for single-family lots allow a street crossing of 19.7 feet or 40% of the lot width, with a minimum of 9.8 feet. Lane crossings can be up to 29.5 feet plus a 10-foot parking pad. The parking guide states the street limit as the lesser of 6.0 metres or 40% of frontage.
What is the maximum driveway slope in Burnaby?
Burnaby allows a maximum slope of 5% on the street portion, which must not be flat, 10% at a lane, and 15% inside the property up to the garage. Changes in grade should not exceed 10% and should be at least 19.7 feet apart. Steeper lots may need regrading or a retaining wall.
Can I have two driveways on a single-family lot in Burnaby?
Usually not. The City says only one driveway is permitted for single-family homes and most properties with residential zoning. Access should come from the lane when one is available, and corner lots without a lane must use the minor street. Any exception needs approval from the City’s Traffic Division.
Do I need a permit to resurface my driveway in Burnaby?
The City’s driveway crossing page covers building, widening and changing driveway crossings, and does not address resurfacing directly. If you are only resurfacing within the same footprint with no change at the street or lane, call Burnaby Engineering at 604-294-7460 to confirm before work starts.
Plan your Burnaby driveway with a local paving contractor
Bortolo and Sons is a family-owned paving contractor in Burnaby, BBB A+ rated since 1994, licensed, insured and WCB covered, with a two-year warranty on eligible work. We’ll check your lot, slope and drainage, explain how the City’s rules apply, and give you a written plan and price. Request a free estimate or call (604) 298-8775.